{"id":3679,"date":"2026-09-09T09:32:27","date_gmt":"2026-09-09T09:32:27","guid":{"rendered":"https:\/\/samrajsolar.com\/?p=3679"},"modified":"2026-09-09T09:34:16","modified_gmt":"2026-09-09T09:34:16","slug":"solar-for-schools-educational-institutions-telangana","status":"publish","type":"post","link":"https:\/\/samrajsolar.com\/?p=3679","title":{"rendered":"Solar for Schools Telangana Cost &amp; Policy Guide 2026"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026-1024x576.png\" alt=\"Solar panels installed on a Telangana school building, illustrating the cost and policy guide for solar energy in schools in 2026.\" class=\"wp-image-3680\" srcset=\"https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026-1024x576.png 1024w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026-300x169.png 300w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026-768x432.png 768w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026-1536x864.png 1536w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/09\/solar-for-schools-telangana-cost-policy-guide-2026.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Every school day starts the same way across Hyderabad, Secunderabad, Guntur and the rest of Telangana. Light in classrooms, fan and air-conditioner starts, computer labs on and electricity meter speeds up. By the afternoon, the operating budget for the month has already taken a large bite out of the commercial tariff. The classrooms have a roof with more than five peak sun hours most days. This mismatch drives the entire discussion around <strong>solar for schools and colleges telangana cost<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Quick Answer Box<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Medium schools will generally need 30-60kW system. At the prevailing commercial rates of \u20b97 to \u20b99 per unit, the monthly saving at 50 kW installation is \u20b945,000 to \u20b960,000. Payback with total ownership is 4-5 years. Systems are provided to government schools through TGREDCO tenders. The existing framework of Telangana solar power Policy also provides the same <a href=\"https:\/\/www.tgerc.telangana.gov.in\/\">net-metering rules<\/a> to private institutions that are available to the commercial consumers. Residential PM Surya Ghar subsidy invalid.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Why the Numbers Favour Action Now<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Educational campuses are mostly in operation during daylight. The hours of the solar generation are the same. The common large, flat or gently sloping roofs of school and college buildings give a suitable area. Meanwhile, the state has fast-tracked institutional solar thru the 2026 <a href=\"https:\/\/tgredco.telangana.gov.in\/\">TGREDCO program<\/a> that aims to cover 9,937 government schools with TOPCon modules and net metering. However private institutions are not eligible to participate in such tenders but they work under the improved regulatory environment created by Telangana Electricity Regulatory Commission Rooftop Solar PV Grid Interactive Systems Regulation 2025.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Tariff Reality for Schools and Colleges<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Most private schools and colleges are on commercial tariffs of LT-2. Usually, effective tariff rates after fixed charges are in the range of \u20b97.15 to \u20b99 per unit. A campus uses 8,000\u201312,000 units a month, which means bills of \u20b970,000\u2013\u20b91.10 lakh. Those numbers are inflated by bigger colleges with labs, hostels and air-conditioned spaces. Solar kicks out the most expensive units during the day. Net metering: Excess exported reduces next bill.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Technical Choices That Determine Performance<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The module technology has changed. N-Type TOPCon modules have higher efficiency, lower temperature losses and better diffuse light response than older Mono PERC cells. Now, TOPCon has become a mandatory requirement in TGREDCO tenders, a sign of the preferred standard for institutional projects. Most school roofs are suited for string inverters, which allow for modular growth and easier servicing. <a href=\"https:\/\/samrajsolar.com\/hybrid-solar-systems\/\">Hybrid systems<\/a> with storage only make sense when you want to back up the critical loads (exam servers, water pumps, security) during grid outages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The roof shall be independently assessed for structural capacity. Many older educational buildings were designed for lower live loads . Modern solar arrays add 15-25 kg per square metre distributed, but point loads and monsoon wind uplift must be verified. Shadow analysis prevents trees, water tanks or neighbouring structures underperforming. Any project wishing to ensure long-term policy matching has to adhere to the <a href=\"https:\/\/mnre.gov.in\/\">ALMM List-II.<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>How Many Solar Panels Are Needed to Run a School?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Number of panels depends on wattage and required capacity not just student numbers. You would need about 90-95 panels to get a 50 kW system using 540-580 W TOPCon modules. A 20 kW system requires 35-40 panels. A 100 kW system will require 170\u2013185 panels. The right starting point is twelve months of electricity bills not roof area. Oversizing leads to excess export at lower effective value. Undersizing means no handling of the high daytime tariffs. Professional Load Analysis We convert your bill data into accurate kW and panel requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Financial Structures Available<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">CAPEX ownership: the full installed cost (at present \u20b942,000\u2013\u20b952,000 per kW for quality systems) is paid by the institution and all the units of generation benefit are retained by it. Educational trusts registered as companies are also eligible for 40 per cent accelerated depreciation in the first year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">RESCO model: a developer owns and installs the system. The school pays a fixed rate, usually \u20b94\u20135.50 per unit, for the solar electricity consumed. No capital expenditure required. Contract terms are generally 15-25 years.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Telangana Solar Power Policy Framework for Institutions<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The existing framework is based on Telangana Clean and Green Energy Policy and 2025 TERC rooftop regulation. Net metering allowed up to 500 kW. Gross metering up to 1MW is available. Residential and government customers can install systems up to 100 percent of sanctioned load. Some interpretations have a ceiling of 80 per cent for commercial and institutional consumers. Exact language needs to be checked with the DISCOM. There are exemptions for banking charges, wheeling charges and cross-subsidy surcharges in several metering arrangements which improve project economics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 20 percent rule (20 percent CFA on capacity above 3 kW) appearing in older residential subsidy documents is not applicable to educational institutions. The PM Surya Ghar Muft Vyapar Yojana is not available to private schools and colleges. Residential scheme is not the source of capital support for government schools thru state tenders.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Application Path for Net Metering and Any Available Support<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For private institutions, the process begins with a TGSPDCL or TGNPDCL net-metering application, followed by <a href=\"https:\/\/cea.nic.in\/\">technical feasibility<\/a>, installation <a href=\"https:\/\/samrajsolar.com\/epc-services\/\">by a registered EPC<\/a>, bi-directional meter installation and final commissioning. If the systems are larger than 100 kW, a CEIG clearance is required. Regulation timeline for 2025 is tighter than previous years but actual speed depends on complete documentation. There is no separate institutional solar subsidy application for private colleges and schools. Any concessional financing (e.g., SIDBI 4E or similar) would be thru the lender\u2019s own process once the technical proposal is ready.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Table 1: Technical &amp; Financial Solar Matrix for Educational Institutions in Telangana (2026)<\/strong><\/h2>\n\n\n\n<figure style=\"font-size:12px\" class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>System Size<\/strong><\/td><td><strong>Typical Institution<\/strong><\/td><td><strong>Approx. Gross Cost (\u20b9 lakh)<\/strong><\/td><td><strong>Monthly Generation (units)<\/strong><\/td><td><strong>Monthly Savings at \u20b98\/unit (\u20b9)<\/strong><\/td><td><strong>Indicative Payback (years)<\/strong><\/td><td><strong>Approx. Panel Count (540\u2013580 W)<\/strong><\/td><\/tr><tr><td>20 kW<\/td><td>Small school<\/td><td>9\u201311<\/td><td>2,400\u20132,800<\/td><td>19,000\u201322,000<\/td><td>4\u20135<\/td><td>35\u201340<\/td><\/tr><tr><td>50 kW<\/td><td>Medium school \/ junior college<\/td><td>22\u201327<\/td><td>6,000\u20137,500<\/td><td>48,000\u201360,000<\/td><td>4\u20135<\/td><td>90\u201395<\/td><\/tr><tr><td>100 kW<\/td><td>Large school \/ degree college<\/td><td>42\u201352<\/td><td>12,000\u201315,000<\/td><td>96,000\u20131,20,000<\/td><td>4\u20135<\/td><td>170\u2013185<\/td><\/tr><tr><td>200\u2013500 kW<\/td><td>Engineering campus<\/td><td>85\u2013250<\/td><td>24,000\u201375,000<\/td><td>1.9\u20136 lakh<\/td><td>4\u20136<\/td><td>350\u2013900<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Then there was a blank line, and the narrative went on.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The figures are for quality Tier-1 modules, proper orientation and average irradiation at Hyderabad. Actual results will vary depending upon the roof, sanctioned load and exact tariff slab. The only sure bet is a professional energy audit that reviews the last twelve months of bills.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The load study is followed by structural engineering. A good report costs very little compared to the possible future cost of roof problems or insurance problems. Once the structural clearance is obtained, DISCOM application and detailed engineering can be done in parallel.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The choice of module today has multi-year consequences. TOPCon modules protect generation in Telangana heat and monsoon diffuse light The difference in energy over 25 years with older technology is often more than 8-10 percent. That difference is all profit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Inverter clipping, cable losses and temperature coefficient effects are better modelled than ignored. If these factors are not properly taken into consideration for the design, a system that looks strong on paper can under-perform by 5-7 percent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Output during the monsoon months is 30-40 per cent down from peak summer. If properly designed, the annual yield in the Hyderabad\u2013Rangareddy belt still is 1,400\u20131,550 units per kW. Institutions which schedule cleaning and inspection around pre-monsoon and post-monsoon windows, protect generation and equipment life.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>Table 2: Generic Solar Advice versus Strategic EPC Thinking<\/strong><\/h2>\n\n\n\n<figure style=\"font-size:12px\" class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Aspect<\/strong><\/td><td><strong>Generic Advice Often Heard<\/strong><\/td><td><strong>Strategic EPC Approach Required for Educational Institutions<\/strong><\/td><\/tr><tr><td>System sizing<\/td><td>Fill the entire roof<\/td><td>Size to actual daytime load profile plus modest headroom<\/td><\/tr><tr><td>Panel count<\/td><td>One panel per student or fixed formula<\/td><td>Convert twelve months of bills into exact kilowatt and panel requirement<\/td><\/tr><tr><td>Module selection<\/td><td>Any ALMM module is fine<\/td><td>Specify N-Type TOPCon with documented temperature coefficient<\/td><\/tr><tr><td>Ownership model<\/td><td>Always CAPEX or always RESCO<\/td><td>Model both options against the institution\u2019s capital policy<\/td><\/tr><tr><td>Structural check<\/td><td>Roof looks strong enough<\/td><td>Independent structural engineer report with wind-load analysis<\/td><\/tr><tr><td>Subsidy expectation<\/td><td>Apply for residential subsidy<\/td><td>Confirm ineligibility for PM Surya Ghar and pursue net metering only<\/td><\/tr><tr><td>Capacity rule<\/td><td>Follow the old 20 percent residential rule<\/td><td>Apply current TERC limits and DISCOM sanctioned-load rules<\/td><\/tr><tr><td>Maintenance<\/td><td>Clean panels twice a year<\/td><td>Scheduled cleaning, thermal imaging and performance-ratio tracking<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The difference between the two columns is the difference between a system that just exists and a system that delivers predictable financial results for fifteen to twenty-five years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Schools that view solar as a strategic infrastructure decision \u2014 not a procurement decision \u2014 consistently achieve better outcomes. They begin with good load data, require independent structural verification, require transparent generation estimates and choose technology that fits Telangana\u2019s climate, not the lowest first cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The regulatory landscape in 2026 favours this approach. There are clearer rules for net metering. Capacity limits are increased. State tenders for government schools have normalised the concept of solar on educational roofs. Now, private institutions are more confident to move forward.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A detailed site assessment for any school or college management is the practical next step. It will look at the last twelve months of electricity bills, roof condition, sanctioned load and shadow profile. These data allow a realistic forecast of generation, cost estimate and payback calculation. Only then does the choice between CAPEX and RESCO make sense.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Institutions that finish this process in 2026 will be able to lock in lower operating costs for the next twenty years as commercial tariffs keep going up.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-medium-font-size\"><strong>People Also Ask<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>How many solar panels are needed to run a school?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The number of panels depends on the capacity of the system you need and the wattage of the modules you choose . A 20 kW system using 540-580 W TOPCon modules will require 35-40 panels. A 50kW system needs 90-95 panels. For a 100 kW system, between 170 and 185 panels would be needed. The right way is to take twelve months of electric bills and turn them into a kw target that matches daytime load and divide by the module wattage. Just the number of students or classrooms used will give you inaccurate results. Professional load analysis prevents under-sizing or wasteful over-sizing.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What is the new solar policy in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The existing framework is based on the Telangana Clean and Green Energy Policy and the Telangana Electricity Regulatory Commission <a href=\"https:\/\/samrajsolar.com\/rooftop-solar-installation-hyderabad\/\">Rooftop Solar PV Grid Interactive Systems<\/a> Regulation 2025. Net metering is permitted for up to 500 kW and gross metering for up to 1 MW. Residential and government customers can size systems up to 100% of the sanctioned load. In many cases commercial and institutional consumers are limited to 80 percent. Cross-subsidy charges, bankings and wheeling are exempt in several arrangements. TGREDCO is continuing to carry out large government-school programs under the same policy umbrella.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>How to apply for solar subsidy in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">PM Surya Ghar residential subsidy not applicable to private schools, colleges. The plan is only for residential consumers. The government schools get capital support thru the TGREDCO tenders and not thru the residential portal. This is why only the private sector organisations apply for net metering to TGSPDCL or TGNPDCL. The process starts with a formal application, a technical feasibility study, installation by a registered EPC, installation of a bi-directional meter and final commissioning. For any concessional finance from institutions such as SIDBI, a separate lender process follows once the technical proposal is completed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What is the 20% rule for solar?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The 20 percent figure is based on the old rules for residential Central Financial Assistance which had provided a 40 percent subsidy for the first 3 kW and 20 percent for additional capacity up to 10 kW. That structure doesn\u2019t apply in the academic world. Private schools and colleges are totally out of the residential subsidy. The capacity limit for institutions is now prescribed under the 2025 TERC regulation and the DISCOM\u2019s sanctioned-load rules instead of the old residential percentage formula.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What is the typical cost of a 50 kW solar system for a school in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A complete 50 kW <a href=\"https:\/\/samrajsolar.com\/grid-tie-systems\/\">grid-tied system<\/a> with high quality N-Type TOPCon modules will cost anywhere from Rs 22 lakh to Rs 27 lakh. Generation is expected to be 6,000-7,500 units\/month as per Hyderabad conditions. At \u20b98 per unit commercial tariff, the monthly saving is in the order of \u20b948,000 to \u20b960,000, providing a simple payback of four to five years at full CAPEX ownership. Separate budgeting for structural audit, and any CEIG clearance costs.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Can private schools claim accelerated depreciation on solar systems?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Educational trusts and private schools registered as companies can claim 40 per cent accelerated depreciation on the value of solar systems in the first year under the Income Tax Act. If the institution chooses the CAPEX ownership route, this benefit improves the effective payback. Please confirm the exact tax treatment with the institution\u2019s chartered accountant.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>How does net metering work for educational institutions under TGSPDCL?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Surplus generation during weekends, holidays and vacation periods is exported to the grid and credited against subsequent import. The credit is applied at the applicable tariff. Application begins with the DISCOM, followed by technical feasibility, installation, bi-directional meter installation and commissioning. Systems above 100 kW additionally require CEIG clearance. Processing timelines have improved under the 2025 regulation, yet complete documentation remains essential for timely approval.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Who provides end-to-end solar EPC solutions for educational institutions in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">About Samraj Solar Samraj Solar is a Solar EPC company, founded in 2014 by Mr. Abburi Ajay Kumar. The head office is located at H.No. 3-5-242\/1, Krishna Nagar, Moula Ali, Hyderabad and the branch office is Guntur. The company has executed projects for residential, commercial, industrial and institutional clients throughout Telangana and Andhra Pradesh, including for educational institutions. As an authorised channel partner of Tata Power Solar, it offers end-to-end EPC, net-metering support and after-sales service for school and college rooftop systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Educational institutions ready to move from general interest to a site-specific feasibility study can request a detailed load analysis and roof assessment. Accurate data on electricity bills, roof condition and sanctioned load form the foundation for any reliable solar proposal.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Every school day starts the same way across Hyderabad, Secunderabad, Guntur and the rest of Telangana. Light in classrooms, fan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"Solar for Schools Telangana Cost & Policy Guide 2026","_seopress_titles_desc":"Full 2026 guide to solar for schools and colleges in Telangana. Costs, payback, TGREDCO policy, net metering, TOPCon modules, subsidy rules and CAPEX vs RESCO explained for educational institutions.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"16","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"solar for schools and colleges telangana cost,Telangana solar power Policy,solar for schools Telangana,rooftop solar educational institutions,school solar cost Telangana,TGREDCO school solar,net metering schools Telangana,solar colleges Telangana,TOPCon solar schools,institutional solar EPC,solar for schools and colleges telangana cost 2026,Telangana solar power Policy for institutions,how many solar panels needed for a school,new solar policy Telangana 2025 2026,apply for solar subsidy educational institutions Telangana,20 percent rule solar capacity,CAPEX RESCO school solar,structural audit school rooftop,ALMM TOPCon school solar,CEIG clearance college solar,monsoon generation school solar,bi-directional meter educational,TERC rooftop regulation institutions,50 kW solar savings school Hyderabad,private school solar net metering,government school solar tender,hybrid solar campus backup,SIDBI financing educational solar,roof load school solar Telangana,daytime load matching solar schools,how many solar panels for school,new solar policy in Telangana,solar subsidy application Telangana,20% rule for solar","postBodyCss":"","postBodyMargin":[],"postBodyPadding":[],"postBodyBackground":{"backgroundType":"classic","gradient":""},"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[16,103,105,102,106,104],"tags":[119,115,121,116,118,107,114,112,108,120,111,113,109,110,117],"class_list":["post-3679","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","category-commercial-solar","category-epc-services","category-institutional-solar","category-net-metering-policy","category-telangana-solar-guides","tag-20-percent-rule","tag-capex-resco","tag-ceig-clearance","tag-educational-rooftop","tag-institutional-solar","tag-net-metering-schools","tag-school-solar-cost","tag-solar-for-schools-and-colleges-telangana-cost","tag-solar-panels-for-school","tag-structural-audit","tag-subsidy-eligibility-schools","tag-telangana-solar-power-policy","tag-terc-2025","tag-tgredco-tender","tag-topcon-modules"],"_links":{"self":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3679"}],"version-history":[{"count":3,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3679\/revisions"}],"predecessor-version":[{"id":3683,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3679\/revisions\/3683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/media\/3680"}],"wp:attachment":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}