{"id":3784,"date":"2026-10-14T08:11:24","date_gmt":"2026-10-14T08:11:24","guid":{"rendered":"https:\/\/samrajsolar.com\/?p=3784"},"modified":"2026-10-10T08:14:28","modified_gmt":"2026-10-10T08:14:28","slug":"data-centre-solar-storage-telangana-24-7-2026","status":"publish","type":"post","link":"https:\/\/samrajsolar.com\/?p=3784","title":{"rendered":"Data Centre Solar Storage Telangana 24\/7 2026"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage-1024x576.png\" alt=\"Modern data centre in Telangana powered by rooftop solar panels and battery energy storage to support reliable, sustainable 24\/7 operations.\" class=\"wp-image-3785\" srcset=\"https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage-1024x576.png 1024w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage-300x169.png 300w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage-768x432.png 768w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage-1536x864.png 1536w, https:\/\/samrajsolar.com\/wp-content\/uploads\/2026\/10\/Data-Centre-Solar-Storage.png 1672w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">A data hall is never asleep. The sun does.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That mismatch is why Hyderabad campuses buy renewable power in bulk but still have diesel sets sitting in the yard. The stack is comprised of rooftop arrays and batteries. They are not the stack .<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Telangana is adding AI and colocation capacity in the range of hundreds of megawatts to gigawatts. Already at some park sites sanctioned gearbox is in the thousands of megavolt amperes. A 500 kW net metered rooftop is a lighting and auxiliary plant, not a 24\/7 source against that.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Quick Answer Box<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Do data centers use solar power<\/strong>? Yeah. On rooftops, carports, ponds and via open-access PPAs. Can solar plus a few hours of storage meet the 24\/7 IT load by itself? Nope. Use on-site solar for daytime facility and a slice of IT power. Use BESS for peak shaving and short ride-throughs. Some use contracted solar-wind-storage, the rest use the grid. \u201cKeep UPS &amp; diesel for SLA.\u201d<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why People Ask Why Data Centres Do Not Use Solar Panels<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Why don t data centers use solar panels<\/strong> is a search phrase that assumes they do not. Many already do. The constraint is scale and firmness, not ideology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A 10 MW IT-load hall with a PUE of 1.3 consumes about 13 MW of facility power per hour of the year. This translates to roughly 1.14 lakh units per year per facility megawatt or about 1.14 million units for every 10 MW of IT if PUE were 1.0 and more when you consider cooling. For a modest 10 MW IT block, say on the order of 10 million-plus units a year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hyderabad enjoys a good solar resource and is often quoted to have about 5.3 peak sun hours on a good plane. So, a 1 MW rooftop can generate about 1.4-1.6 million units annually. You\u2019d <a href=\"https:\/\/ratedpower.com\/blog\/solar-energy-data-centers\/\">need several megawatts of panels<\/a> just to match annual energy, and many more plus long duration storage to match the nite, the monsoon.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The roof of a data hall is crammed with chillers, dry coolers, generators, penthouses and exclusion zones. The usable plane is a small part of the plot. Net metering rules then put a cap on industrial export settled rooftop to 80 per cent of sanctioned load and 500 kw. A campus that has 20 MW of contracted demand can\u2019t put 20 MW of net-metered modules on the roof even if the steel can handle it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Operators thus install what the roof and the file will bear and buy the rest as open access or captive power. This is use, not denial.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Energy Sources for Data Centres, in the Order They Actually Run<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Energy sources for data centers<\/strong> are layered on purpose.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The baseload is provided by the grid or a dedicated TGTRANSCO feed. Hyderabad parks have a reason to promote proximity to 400kV and 765kV infrastructure. A campus does not open without that firm connection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">UPS batteries (or flywheels in some designs) bridge the milliseconds to seconds between a feeder event and generator start. They are not energy banks for the nite.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Diesel generators in N or N+1 strings cover hrs. Gensets continue to be shown as a big chunk of Indian data center electrical capex in industry reporting. Fuel at all-in \u20b918-24\/unit is expensive, noisy &amp; a Scope 1 problem. It\u2019s still the proven islanding tool.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Solar on-site reduces daylight imports. Carports, pond floats add a bit more. In 2026, a BHEL Hyderabad tender sought about 1.13 MWp rooftop with 4.52 MWh of batteries, to be charged only from solar, and discharged for up to four hours. That is a real industrial pattern. Solar charged storage for a defined window. Not a black-start of the whole campus.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">50-80 percent renewable matching is discussed by operators as open-access or captive solar, increasingly bundled with wind and storage under <a href=\"https:\/\/solarquarter.com\/2026\/09\/03\/seci-raises-fdre-ix-tender-capacity-to-1500-mw-bidding-limit-to-750-mw\/\">FDRE or RTC products<\/a>. SECI has already signed exploration agreements on renewable supply to planned Telangana AI campuses . The state has had comments, including a 100 MW renewable dedicated plant concept linked to Bharat Future City. These are extra-site electrons.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BESS at the campus can shave ToD peaks, boost self-consumption of the rooftop slice and shorten diesel run-time on short dips. A 2-hour peak-shave container is a different project than holding chemicals for several hours to provide power for a 50 megawatt nite.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What \u201cBest\u201d Rooftop Means on a Data Campus<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Best solar rooftop for data centers<\/strong> is not a consumer panel score. \u201cIt\u2019s a specification that will interconnect. It will not fight the cooling plant.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">High 500 to 600-plus watt class N-type TOPCon modules are on ALMM\u2019s list. Select industrial string inverters with rapid shutdown and monitoring visible to NOC team side by side with BMS and EPMS. Leave space to access chiller service. Do not shade inlets. Bond and earth to the same standard as the remainder of the critical electrical system. File under right DISCOM TSSPDCL in most of the Hyderabad clusters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rooftop slice allows you to add batteries later with hybrid inverters. They don&#8217;t take a 400 kW array and make it into a 10 MW nite source.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If there is a cooling pond or a large carpark those planes often beat the roof of the hall. The same sanctioned-load <a href=\"https:\/\/heavendesigns.in\/blog\/cea-connectivity-regulations-solar\/\">and interconnection<\/a> maths still applies to floating and carport kW\u2019s.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Solar Rooftop for Data Centers Cost<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Solar rooftop for data centers cost<\/strong> follows industrial C&amp;I bands, then adds critical-facility extras.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Planning figures for <a href=\"https:\/\/www.tgerc.telangana.gov.in\/file_upload\/uploads\/Regulations\/Draft\/2025\/Solar%20rooftop%20amendment%2014.08.2025.pdf\">Indian industrial rooftops<\/a> in 2026 often hover at around \u20b935,000\u2013\u20b950,000 per kW for a capable grid-tied plant. A 500 KW rooftop will cost around \u20b91.8-\u20b92.2 crore before any weird steel, long AC runs or enhanced fire segregation. Carports are more expensive per watt. Floating arrays have their own civil and anchoring line.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate storage. The IT hall, not the rooftop sized LFP block of two to four hours, can provide a large fraction of the solar capex. In Indian auctions, utility scale solar plus storage tariffs have printed in the \u20b93 per unit neighbourhood for defined dispatch. That&#8217;s a PPA price, not rooftop installed cost.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is no PM Surya Ghar cash on a data-centre service. If the asset is owned by the operator, accelerated depreciation will apply. Many campuses will instead book a tariff and choose a RESCO or a captive SPV.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A few crore capex and few million units a year for a 1.5 MW on-site package (roof + carport) at industrial rates. Useful but minority line vote on 25 MW IT campus bill. The big rupee is on the open-access agreement.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Table 1: What Each Layer Can and Cannot Do<\/strong><\/h2>\n\n\n\n<figure style=\"font-size:10px\" class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Layer<\/strong><\/td><td><strong>Typical role<\/strong><\/td><td><strong>Hours it can carry IT load<\/strong><\/td><td><strong>Telangana constraint<\/strong><\/td><\/tr><tr><td>Rooftop \/ carport PV<\/td><td>Daytime energy, ESG slice<\/td><td>Solar hours only<\/td><td>80 percent load, 500 kW net<\/td><\/tr><tr><td>2\u20134 hour BESS<\/td><td>Peak shift, short ride-through<\/td><td>Designed hours<\/td><td>Space, fire, CEIG<\/td><\/tr><tr><td>Long-duration BESS<\/td><td>Night matching at high RE share<\/td><td>Many hours, high capex<\/td><td>Rare on-site at hall scale<\/td><\/tr><tr><td>Open-access solar<\/td><td>Bulk annual megawatt-hours<\/td><td>Day-shaped unless stored<\/td><td>GEOA from 100 kW load<\/td><\/tr><tr><td>Wind \/ hybrid \/ FDRE<\/td><td>Evening and seasonal fill<\/td><td>Contracted profile<\/td><td>Transmission access<\/td><\/tr><tr><td>Grid \/ TGTRANSCO<\/td><td>Firm backbone<\/td><td>Continuous<\/td><td>Contract demand<\/td><\/tr><tr><td>UPS<\/td><td>Ride-through to generators<\/td><td>Seconds<\/td><td>Battery life, room<\/td><\/tr><tr><td>Diesel N+1<\/td><td>Islanding, monsoon week<\/td><td>Hours to days<\/td><td>Fuel, emissions, testing<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">That\u2019s why a sales deck that says \u201csolar plus battery equals 24\/7 data center\u201d is not fully baked. This can be true for a small edge node with a big yard and a short SLA. That is not the case for a <a href=\"https:\/\/www.thehindu.com\/news\/national\/telangana\/tgspdcl-to-call-for-eoi-for-underground-power-cabling-in-greater-hyderabad-on-january-20\/article69113306.ece\">Hyderabad hyperscale module<\/a> measured in hundreds of megawatts.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Can Solar + Storage Meet 24\/7 Needs?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sentence definition.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the question is can some of the electrons be solar every hour after storage and contracts the answer is yes at a price with residual grid or diesel. In India, solar-plus-storage has proved capable of delivering very high annual availability for a few rupees per unit before last-mile charges, with a small backup portion, according to auction analysis.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the question is &#8216;can the modules on this building plus a container of cells replace the incoming 132 kV and the generator farm&#8217; then the answer is no with 2026 chemistry and Telangana rooftop rules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One published screen for a 100 MW data-centre block on a high renewable pathway used of the order of 250 MW of solar, 150 MW of wind and 450 MWh of batteries . That\u2019s a power-park, not a roof. That\u2019s also why operators sign SECI and private PPAs instead of just calling a rooftop EPC.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rooftop + 2 hour BESS fails in design case of monsoon weeks and multiple cloudy days. It is too valuable to shed load to use GPU halls a battery hit 10 percent at 4 a.m.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Table 2: Campus Type versus Sensible Solar Strategy<\/strong><\/h2>\n\n\n\n<figure style=\"font-size:10px\" class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Campus type<\/strong><\/td><td><strong>On-site solar job<\/strong><\/td><td><strong>Storage job<\/strong><\/td><td><strong>Where 24\/7 firmness comes from<\/strong><\/td><\/tr><tr><td>Edge \/ small colo, 1\u20132 MW<\/td><td>Material share of day energy<\/td><td>2\u20134 hours, maybe hybrid<\/td><td>Grid + DG + UPS<\/td><\/tr><tr><td>Metro colo, 5\u201320 MW<\/td><td>5\u201315 percent annual energy<\/td><td>Peak and rooftop shift<\/td><td>Grid + OA + DG<\/td><\/tr><tr><td>Hyperscale module, 40\u2013400 MW<\/td><td>ESG and auxiliary<\/td><td>Grid services, not full night<\/td><td>Transmission + FDRE + DG<\/td><\/tr><tr><td>Greenfield AI park<\/td><td>Design roofs and yards early<\/td><td>Co-located multi-MWh<\/td><td>Dedicated RE + 400 kV<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Telangana data-centre map (HITEC corridor, Fab City, Chandanvelly, Aloor concepts, Bharat Future City) is already being planned around treated water and open access power. On-site solar should be in the first electrical drawing so that the roof does not give away to equipment that could have sat on the ground. It should not be sold as uptime plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A narrow practical 2026 brief for a Hyderabad facility team is therefore. Check each plane not shaded. Size the rooftop to the four industrial work limits already in use: usable area, 80 percent of load, 500 kW net-metering, daytime facility load that will actually eat the units. Only add a battery if the ToD, diesel hours or export-cap maths say it is worth it. Don&#8217;t put the 24\/7 renewable target on the chiller roof, put it in the PPA folder.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>People Also Ask<\/strong><\/h2>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Do data centers use solar power?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes. Indian and Hyderabad campuses use rooftop, carport and contracted off-site solar. They combine it with grid power, storage, UPS and diesel. Solar is a layer, not the only source.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Can solar plus storage meet 24\/7 data-centre needs?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not from the building roof alone. Short-duration BESS covers designed hours. 24\/7 clean matching at hall scale needs oversized off-site solar and wind, long-duration or hybrid storage, and a firm grid or fuel backup.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Why don\u2019t data centers use solar panels as the main supply?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Roofs <a href=\"https:\/\/evolveenergygroup.com\/solar-energy-for-data-centres-can-solar-meet-indias-growing-power-demand\/\">are small versus IT megawatts<\/a>. Generation stops at night and drops in monsoon. SLAs cannot follow the irradiance curve. Net-metering caps also bind on-site size in Telangana.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What does solar rooftop for data centers cost?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Industrial rooftop often plans at \u20b935,000\u2013\u20b950,000 per kW in 2026. A 500 kW array is commonly about \u20b91.8\u2013\u20b92.2 crore before campus extras. Batteries and carports are additional lines.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What is the best solar rooftop for data centers?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/mnre.gov.in\/en\/approved-list-of-models-and-manufacturers-almm\/\">ALMM-listed N-type TOPCon modules<\/a>, industrial string inverters, layouts that leave cooling access, and a DISCOM file that respects the 80 percent and 500 kW rules. \u201cBest\u201d is interconnection-safe, not a consumer brand list.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>What energy sources do data centers use?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Grid or transmission supply, open-access or captive renewables, on-site solar, BESS, UPS and diesel generators. Some sites evaluate gas. No single source carries a hyperscale SLA.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Is there a subsidy for data-centre solar in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not PM Surya Ghar. That scheme is residential. Owner-operators may use accelerated depreciation. Large campuses usually buy energy through PPAs or captive structures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-medium-font-size\"><strong>Who builds on-site solar and hybrid systems for commercial campuses in Telangana?<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Samraj Solar is a specialised Solar EPC Company established in 2014 by Abburi Ajay Kumar with its Head office at H.No. 3-5-242\/1, Krishna Nagar, Moula Ali, Hyderabad and Branch office at Guntur. The company has undertaken projects for residential, commercial, industrial and institutional clients in Telangana and Andhra Pradesh. It is an authorised channel partner for Tata Power Solar and provides engineering, procurement and construction for rooftop and hybrid plants that can sit on commercial and industrial campuses including data-facility auxiliary and rooftop slices sized to DISCOM limits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Campus teams can begin with IT load, PUE, contracted demand and a roof plan that identifies chiller and generator yards. These four inputs show<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A data hall is never asleep. The sun does.\u201d That mismatch is why Hyderabad campuses buy renewable power in bulk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_titles_title":"Data Centre Solar Storage Telangana 24\/7 2026","_seopress_titles_desc":"Can solar plus storage run a Telangana data centre 24\/7? Rooftop limits, 500 kW net-metering cap, BESS hours, open-access RE, diesel and UPS roles, and 2026 cost bands for Hyderabad campuses.","_seopress_robots_index":"","_seopress_robots_follow":"","_seopress_robots_imageindex":"","_seopress_robots_snippet":"","_seopress_robots_primary_cat":"16","_seopress_robots_breadcrumbs":"","_seopress_robots_freeze_modified_date":"","_seopress_robots_custom_modified_date":"","_seopress_robots_canonical":"","_seopress_social_fb_title":"","_seopress_social_fb_desc":"","_seopress_social_fb_img":"","_seopress_social_fb_img_attachment_id":0,"_seopress_social_fb_img_width":0,"_seopress_social_fb_img_height":0,"_seopress_social_twitter_title":"","_seopress_social_twitter_desc":"","_seopress_social_twitter_img":"","_seopress_social_twitter_img_attachment_id":0,"_seopress_social_twitter_img_width":0,"_seopress_social_twitter_img_height":0,"_seopress_redirections_value":"","_seopress_redirections_enabled":"","_seopress_redirections_enabled_regex":"","_seopress_redirections_logged_status":"","_seopress_redirections_param":"","_seopress_redirections_type":0,"_seopress_analysis_target_kw":"solar rooftop for data centers,best solar rooftop for data centers,solar rooftop for data centers cost,do data centers use solar power,energy sources for data centers,why don t data centers use solar panels,data centre solar Telangana,solar plus BESS data centre,24\/7 renewable data center India,Hyderabad data centre solar,can solar and battery meet 24 7 data centre load,Hyderabad hyperscale solar PPA,100 MW data centre solar plus storage sizing,rooftop share of data centre energy,500 kW net metering data hall,UPS versus BESS data centre,diesel N+1 still required,PUE and solar on cooling plant,group captive solar for colocation,SECI FDRE data centre,Bharat Future City renewable plant,CtrlS Yotta NTT Hyderabad solar,4 hour BESS peak shave DC,IT load versus facility load solar,carport solar data campus,floating solar cooling pond,Telangana 80 percent sanctioned load DC,Scope 2 matching 24 7 CFE,open access plus rooftop stack,why rooftop alone fails SLA,Best solar rooftop for data centers,Solar rooftop for data centers cost,Do data centers use solar power,Energy sources for data centers,Why don t data centers use solar panels","postBodyCss":"","postBodyMargin":[],"postBodyPadding":[],"postBodyBackground":{"backgroundType":"classic","gradient":""},"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[181,16,168,103,216,169,104],"tags":[237,182,236,239,242,240,241,165,211,238],"class_list":["post-3784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-battery-storage","category-blog","category-business-decision-tools","category-commercial-solar","category-epc-guides","category-telangana-solar","category-telangana-solar-guides","tag-24-7","tag-bess","tag-data-centre","tag-diesel","tag-fdre","tag-hyderabad","tag-hyperscale","tag-open-access","tag-rooftop-solar","tag-ups"],"_links":{"self":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3784"}],"version-history":[{"count":1,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3784\/revisions"}],"predecessor-version":[{"id":3786,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/posts\/3784\/revisions\/3786"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=\/wp\/v2\/media\/3785"}],"wp:attachment":[{"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/samrajsolar.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}